REQUEST FOR EXPRESSIONS OF INTEREST (REOI)

(CONSULTING SERVICES)

NILE BASIN INTIATIVE (NBI)/NILE EQUATORIAL LAKES SUBSIDIARY ACTION PROGRAM (NELSAP)

Power/Energy

Project ID P-Z1-FAD-018; Grant No.: 5150155003151

Update of Feasibility Study, Detailed Design and Tender Document Preparation for Uganda-DRC Power Interconnection Line.

 

The Nile Basin Initiative/ Nile Equatorial Lakes Subsidiary Action Program (NBI/NELSAP) has received financing from the African Development Bank (AfDB) towards the cost for Uganda-D.R Congo Power Interconnection Line Project and intends to apply part of the agreed amount for this grant to payments under the contract for the Update of Feasibility Study Report, Detailed Design and Tender Documents for the transmission line and associated substations Uganda and D.R Congo.

The services under this project include the Update of the Feasibility Study Report, Detailed Design and Tender Documents. The proposed project consists of construction of a high voltage transmission line and associated substations at Beni, Butembo and Bunia and upgrade of the Nkenda Substation. The total distance of the line is estimated at 396 km and will run from the existing Nkenda substation in Kasese in western region of Uganda and will continue up to Bunia and Butembo via Beni in the north eastern region of D.R Congo.

At present, Nkenda substation is fed by a long radial single circuit 132 kV line from Mutundwe near Kampala via Kabulasoke and Nkonge substation. Since the completion of the Feasibility Study of this proposed project in 2013, the following transmission line projects have been commissioned in Uganda: Kawanda-Masaka 220kV, Nkenda-Fort Portal-Hoima 220kV, Bujagali-Isimba 132kV, Mbarara-Mirama 220kV, Mbarara-Nkenda 132kV, and Kawanda-Kapeeka 132kV.

The proposed study is expected to come out with an Updated Feasibility Study Report, Detailed Design and Tender Documents for the transmission line, bearing in mind that more than seven (7) years have passed after the first study was done. It is expected that the transmission line will either be at 220kV or 400kV.

The Nile Equatorial Lakes Subsidiary Action Program (NELSAP) now invites eligible consultants to indicate their interest in providing these services. Interested consultants must provide information indicating that they are qualified to perform the services (brochures, description of similar assignments, experience in similar conditions, availability of appropriate skills among staff, etc.). Consultants may constitute joint-ventures to enhance their chances of qualification. Detailed Terms of References can be downloaded from www.nelsap.nilebasin.org

Eligibility criteria, establishment of the short-list and the selection procedure shall be in accordance with the African Development Bank’s “Procurement Policy for Bank Group Funded Operations” dated October 2015, which is available on the Bank’s website at http://www.afdb.org.

Interested consultants may obtain further information at the address below during office hours [email protected] on weekdays from 08:00 to 17:00 hours Rwandan Time, excluding public holidays.

Expressions of interest must be delivered to the address below by 7th October 2020 at 16:00 hours Rwandan time and clearly referenced ‘EOI for Update of Feasibility Study, Detailed Design and Tender Document Preparation for Uganda-DRC Power Interconnection Line’.

Attn : NELSAP-CU, Eng. Elicad Elly Nyabeeya, Regional Coordinator, P.O Box 6759 Kigali,

RWANDA, Tel : +250 788307334, Email : [email protected] with copy to [email protected]